The data readiness checklist

Nine checks on label quality, coverage and access that decide whether a project can be measured at all, and the two that matter most.

22 September 20267 min readKrip Artificial Intelligence Tech

Ask about data readiness and you will be told the number of rows. Volume is the least useful measure on offer: an organisation with a million records and no agreed definition of a defect is less ready than one with four thousand cases that two people have labelled separately. These nine checks predict whether the project can be evaluated at all.

Nine checks

The seventh check is the one that quietly ends projects. If the outcome is known only thirty days later, the system cannot learn from the future it is meant to predict without waiting thirty days for every label. That is a design constraint, and meeting it in month three is expensive.

The second check sets your ceiling. If two trained people agree on only 80% of cases, no model will exceed roughly 80%, and a supplier promising 95% is measuring something else. Run the agreement test before the project starts: an afternoon of work that recalibrates the whole conversation.

None of this needs new infrastructure. It needs somebody to spend a week with the data and the people who will use the output, writing down what they find. That week returns more than any other week in the project.

The check that pays for itself

If you do one thing from the list, measure inter-annotator agreement. Take a hundred cases and have two experienced people label them independently, without discussion. The disagreement rate is your ceiling, and it is usually lower than anyone in the room expects.

That number reframes the project. Where two experts agree 78% of the time, a system that agrees with them 90% of the time is measuring an easier task than the real one, and the evaluation set is the problem rather than the model. Discovering this in week one costs an afternoon; discovering it after deployment costs a year of quiet mistrust.

The trap in your own archive

Data used to build the current process is contaminated. If the team has reviewed the same thousand cases for two years, those cases now encode the review, not the original problem. Separate the held-out set before anyone tunes anything, and keep it away from the people doing the tuning — including you.

The gate

Ask who signs off that the dataset is fit for measurement. Where the answer is nobody, the first deliverable of the project is not a model; it is an owner for the definition.

Turn the nine checks into a one-page memo with a tick, a name and a date beside each line. A checklist that produces no artefact is a conversation; one that produces a signed memo is a gate the project has to pass.

Start with a hundred cases and two experienced people labelling them separately; measure the agreement rate before anyone mentions models.

Questions this answers

How much data is enough?
Enough to measure the difference you care about, with labels you trust. A few hundred well-labelled cases can be enough for a scoped task.
What if the data is spread across systems?
That is normal. The blocking question is access and permission, not the number of systems.
Where this connects
The engineering method
Where data quality is reported.
Engagement models
How a data-first phase is scoped.
Research
Evaluation and reliability as an open question.

Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.

Talk through your case
On this page
Working with KRIP

Engagements start with a written problem definition and an agreed error budget.

Engagement models