Platforms

Nine platforms.
One standard of proof.

Built for the decisions institutions actually make: reading documents, inspecting what leaves a line, running repetitive processes, moving in the physical world. Each page states the stage the platform has reached, so you can see what exists before you commit budget.

9 platformsStage published per platformEvaluation note under NDA
Reading the catalogue

Read the stage before you read the features.

Three words separate what can be demonstrated, what can be reviewed and what can only be designed. They mean the same thing on all nine pages.

Reference build01

Implementation exists

A working implementation, run against a defined test set. The source and the evaluation note are available under NDA.

What that means for you

Can be demonstrated against your data in a scoped pilot.

Prototype02

Pipeline implemented

The core pipeline runs end to end. Coverage, error rates and failure modes are being measured, and interfaces may still change.

What that means for you

Can be reviewed technically; timelines are agreed per engagement.

Specified03

Architecture written

Architecture, interfaces and the evaluation protocol are written and ready to build against. There is no implementation to show yet.

What that means for you

Can be discussed as a design; build effort is estimated at scoping.

Stage labels are our own declaration, dated 8 November 2026, and each one is backed by an artefact — source, evaluation note or design record — available under NDA. They are not third-party certification. Where a client needs evidence of a stage before contracting, the evaluation note and the artefact are provided under NDA rather than summarised in marketing copy. See how the company states evidence.

The catalogue

Nine platforms, grouped by what they read.

Filter by input or by stage. Every card opens a page with what the platform does, who it is for, a worked example, and the limit that applies to it.

Input
Stage

Showing 9 of 9 platforms

At a glance

What each platform takes in, and what it returns.

A comparison of the nine on the four dimensions that decide an integration: the input, the output, where it runs, and how far it has been built.

Comparison of the nine KRIP Intelligence Platforms by input, output, deployment and stage
PlatformInputOutputDeploymentStage
KRIP GPTEnterprise AI assistantPolicy documents, manuals, circularsCited answers, abstentionsClient network or private cloudReference build
KRIP VisionComputer vision platformScans, photographs, video framesField values, defect labels, confidenceEdge device or on-premises serverPrototype
KRIP Robotics OSAutonomous robotics layerSensor streams, motion commandsPermitted motion, stop decisions, logsOn-robot compute, vendor hardwareSpecified
KRIP NexusEnterprise agent platformTickets, records, messagesProposed actions, approvals, ledgerInside the client networkPrototype
KRIP EduAIIntelligent learning ecosystemCurriculum content, learner answersTargeted feedback, misconception reportsSchool server or managed hostingPrototype
KRIP HealthAIClinical intelligenceIntake data, notes, guidelinesDraft notes, triage suggestionsFacility network, no external egressSpecified
KRIP Media AIAI broadcasting platformAudio, video, rundownsTranscripts, timed captions, search indexStation network or private cloudPrototype
KRIP SecureAICyber threat detectionLogs, flow records, endpoint eventsRanked alerts with evidenceOn-premises, inside the SOCSpecified
KRIP AeroAIDrone & aerial intelligenceAerial imagery, flight logsOrthomosaics, change maps, measurementsField laptop and processing serverSpecified

Deployment describes the intended architecture, not a shipped configuration. Any integration is scoped against the systems a client actually runs.

Procurement

Four questions that separate a supplier from a slide deck.

These apply to KRIP as much as to anyone else. A platform page that cannot answer them is a page worth closing.

01

Ask for the evaluation note

Not a headline accuracy figure — the per-class table, the failure taxonomy, and the slices where performance is weakest. If the note does not exist, the claim does not either.

02

Ask what it will not do

Every platform page lists the boundary: what is excluded, what must be reviewed by a person, and what is refused by configuration. Scope you cannot see is scope you cannot approve.

03

Ask for the stage in writing

“Available” is not a stage. Reference build, prototype and specification describe different risks and different contract terms. A supplier who cannot name the stage has not decided what they are selling.

04

Ask for a pilot you can stop

A defined test set, an acceptance criterion, and an exit that does not require renegotiation. A pilot without an exit criterion is a purchase with extra steps.

Questions

What buyers ask first.

If your question is not answered here, write to us. We would rather answer it directly than leave you to infer the answer from a brochure.

What can we actually start with today?
Every platform carries a published stage, and the stage is what an engagement is scoped against. KRIP GPT is a reference build that can be demonstrated against your own documents under NDA and taken into a pilot. Four platforms are prototypes whose interfaces may still change; four are specifications we can design and build with you. The proposal names the stage, the deliverables and the acceptance criteria.
Why publish platforms that are only specified?
Because a multi-year programme needs to know what a supplier is building towards. A published stage lets you plan against reality — specify this year, prototype next, pilot when the evidence exists. A named stage is more useful to you than an implied readiness.
Can I see a live demo of a platform?
Each page carries a documented walkthrough of the method and a labelled reference scenario. Beyond that: for a reference build we can arrange a technical demonstration against your own documents under NDA; for a prototype you review the pipeline and its evaluation note; for a specification you review the design.
Do you name clients or publish accuracy figures?
Client names stay confidential, and accuracy is reported per engagement rather than per brochure: on held-out data drawn from your conditions, with the weakest slices shown. A single platform-wide figure would mislead you, because error depends on the data, the capture conditions and how the classes are defined.
How do the nine platforms relate to each other?
They share a small number of components rather than being nine separate products. KRIP GPT and KRIP Nexus share the retrieval and citation layer. KRIP Vision supplies perception to KRIP Robotics OS and the imagery pipeline in KRIP AeroAI. The evaluation harness, the abstention policy and the audit logging are common to all nine, which is why the standard of evidence is the same across the catalogue.
What does an engagement cost?
Scope determines cost, so scope is written per engagement. A proposal states the deliverables, the acceptance criteria, the stage the platform must reach and the price before work begins. A pilot carries an exit criterion agreed in advance, so it can be stopped without renegotiating anything.
Next step

Start with the decision you already make.

A scoping call establishes whether a platform fits, which stage it would need to reach, and what evidence would settle the question. You will leave it knowing whether we are the right supplier for the work.