How we work

From a written scope to a system you can run.

Every engagement starts with the same discipline: name the decision, agree what a good answer looks like, and prove it on data the system has never seen. What follows is how that happens, stage by stage.

The engagement

Five stages, each with an artefact.

Every stage produces something the client can read and challenge before the next begins. Nothing is accepted on the strength of a demonstration alone.

  1. Frame

    The problem is written down with the decision it supports and the error budget: how often it may be wrong, and which mistakes matter more. Both sides agree that number before anything is built, because a target set later is a negotiation, not a standard.

    Delivered

    A one-page problem definition, signed off by both sides.

  2. Prototype

    The smallest system that can be tested against the definition. Prototypes are built to be discarded; their value is the evidence they produce about what is learnable from the data.

    Delivered

    A working prototype and a first read on data quality.

  3. Evaluate

    Measurement on data the model has not seen, with the failure cases catalogued before results are presented. A number is reported with the test that produced it.

    Delivered

    An evaluation note: metric, test set, failure modes, limits.

  4. Integrate

    Connection to the surrounding process, including the point where a person reviews the output. Human review is placed where the cost of an error is highest, not wherever it is convenient.

    Delivered

    An integration plan and a defined review step.

  5. Hand over

    Documentation, operating instructions and a written statement of the system’s limits. The goal is a system your team can run, audit and improve without us in the room.

    Delivered

    Runbook, limitations note, and a maintenance agreement if wanted.

Evaluation

A number without a test is marketing.

Evaluation is treated as the deliverable, not as a final checkbox. The output is a note that states the metric, the data it was measured on, and the cases where the system fails.

Held-out data
Measured on data the system has not seen. Where that is impossible, the contamination is stated.
Baselines
Compared against a simple, defensible alternative — including a non-AI process where one exists.
Failure modes
Written down before the headline result, grouped by cause rather than by example.
Uncertainty
Reported with the measurement. A single accuracy figure without variance is not accepted.
Hand-over

What the organisation keeps.

A system that only the builder can operate is a dependency, not an asset. Hand-over is a deliverable with its own acceptance criteria.

01

Documentation

Architecture, data flow, model versioning and the assumptions each component depends on.

02

Limits note

A written statement of its limits, with the conditions under which its output should be ignored.

03

Operating procedure

How the system is run, monitored and updated — including who decides when to retrain or retire it.

Hosting, data residency and access are agreed per engagement and written into the scope, so there is never ambiguity about where your data sits or who can reach it.

Constraints

Where we draw the line.

Capabilities tell you what a supplier will attempt. Limits tell you whether you can work with them. Ours are stated up front, so a proposal can be ruled out before anyone writes it.

  • Deploy a system whose failure modes have not been written down.
  • Present a benchmark score without the test that produced it.
  • Automate a decision where the cost of an error falls on someone who cannot appeal it.
  • Claim a certification, partnership or client that does not exist.
  • Take on a project whose success cannot be measured.
Questions

Questions about method.

How a system is specified, what evaluation has to show, and what hand-over leaves behind.

Who writes the problem definition?
We draft it from the first conversation; your organisation signs it off. Neither side signs until both agree on the decision it supports and on the error budget that still makes the system worth using.
What happens if the data is not good enough?
It is reported at the prototype stage, before any evaluation is promised. A project can stop there. Poor data is a finding, not a reason to widen scope quietly.
Can a project skip evaluation?
No. A system without a test set and a stated baseline cannot be handed over, because there is no way to say when its output should not be trusted.
Who owns the model, the code and the data?
Ownership is set out in the engagement agreement and differs by project. This page does not imply a default, and nothing is assumed on either side.
Scope a project

Start with the problem definition.

A first conversation is usually enough to establish whether a problem is specified tightly enough to evaluate — and whether it is worth the build.