Off-the-shelf AI products assume a process that looks like somebody else’s. The form is clean, the categories are stable, the reviewer has time. Your workflow probably has a handwritten annex, a category that exists because of a circular from 2019, and a supervisor who approves by phone. Custom work exists to fit that reality rather than to argue with it.
It is also the more expensive route, and worth it only when the decision is frequent enough and the existing process painful enough to justify a build. Where a platform at reference or prototype stage already fits, we will say so and propose that instead, even though the invoice is smaller.
How the build is organised
| Phase | What you get | What it decides |
|---|---|---|
| Framing | A one-page problem statement | Whether the work should exist |
| Measurement | A test set, a baseline and an evaluation plan | What “good enough” means before code |
| Build | A working pipeline and a review interface | How a person corrects the system |
| Pilot | Two to six weeks in one workflow | Whether it survives real cases |
| Hand-over | Runbook, limits note, training for staff | Whether you can run it without us |
The measurement phase is the one clients try to skip and later wish they had not. Two or three weeks spent agreeing what a correct answer looks like on three hundred real cases prevents the familiar argument in month four about whether the system is working. It also produces the number that the acceptance criteria depend on.
What makes a project a good fit
- The decision repeats weekly or more, and someone owns it
- The inputs are documents, images or logs rather than a clean database
- A wrong answer has a cost that can be described in money, time or risk
- A person already reviews the output, and that review can be made faster
- The data exists, even if it is messy, and you can give access under an NDA
What we decline is equally specific: decisions about liberty or clinical treatment, surveillance of individuals, and any system whose error cannot be measured. Those refusals are written into the same document as the scope, so a project cannot drift into one of them through a change request.
The build is delivered in increments you can stop between: measurement, a working pipeline, a review interface, a pilot. Each increment has its own acceptance criterion, and stopping after any of them leaves you with something useful — a test set, an evaluation, a documented finding — rather than a half-built system.