Company

Our Values

A value that never costs anything is a preference. Here are four that cost us money, time or a contract, and the document each one should leave behind.

Reviewed 8 November 2026

Every company has a list like this. What makes it useful is the second column: the price of holding it. We have tried to write that column honestly, because a value with no price attached is usually a value nobody has been asked to sacrifice anything for.

ValueThe artefact it producesWhat it costs us
Evidence before confidenceAn evaluation note with a dataset, a date and a methodSlower starts, and fewer impressive numbers to quote
Write it downA scope, acceptance criteria, a limits noteMore argument at the beginning, when it is still cheap
Refuse the wrong workA written reason for declining, where one is owedRevenue that another supplier will take this quarter
Hand it overOperating documentation your staff can follow without usThe dependency that would have made us harder to replace

Evidence before confidence

A number is quoted with its method. A claim is quoted with its source. When neither exists, the answer is “we do not know yet”, in those words, in the meeting. This is uncomfortable in a sales conversation and invaluable in a risk committee, because the second audience has to live with the decision long after the first has gone home.

You can test it inside a single meeting. Ask for a number, then ask how it was measured. An answer containing a method, a dataset and a date means the value is operating. An answer containing a headline percentage and nothing behind it tells you something more useful than the number would have.

Write it down, refuse the wrong work, hand it over

Writing things down front-loads disagreement. That is the point: a scope argued over in week one costs an afternoon, and the same disagreement in month five costs a rebuild. Refusal works the same way. We decline surveillance of individuals, autonomous decisions over liberty or health, and systems whose error cannot be measured — and we say which reason applies, because a bare no teaches a client nothing.

Hand-over is the value most often promised and least often practised. A system only its builder can operate is a dependency with an invoice attached. Documentation, limits and operating instructions ship with the code, and the test is simple: could your team run this next quarter if we stopped answering email?

What we will not claim

None of these values is backed by a certification, an award or an external audit. We hold none of those, and a badge for one of them would undermine the others.

Questions

Questions asked before the first call.

These are the questions that come up in procurement and due diligence. Where a fact is not published, the answer says so rather than filling the gap.

How are these values enforced?
Through the engagement template. The scope defines the decision, the evaluation defines success, and the limits note defines where we stop. A project that cannot produce those three documents does not go ahead, whatever the commercial case for it.
Have you ever declined work?
Yes, at scoping, and usually for the same two reasons: the error could not be measured, or the decision the system would make should stay with a person. We will tell you which of those applies if it applies to your project.
Next step

Verify the company, then judge the work.

If the question is legal, start with the registration record. If it is about capability, start with what the company says it will not claim.