Industry

Energy & Utilities

A transmission tower outlives the software that inspects it. Anything installed on a right-of-way has to be operable by the team that inherits it.

IndustriesReviewed 8 November 2026

Inspection is a scheduling problem wearing technical clothing. There are more towers, poles and spans than there are crews, and the choice each month is which ones to visit. Most utilities answer with a cycle: everything, eventually. The cost of that cycle is the failures that arrive between one visit and the next.

Imagery changes the arithmetic. A survey produces far more candidates than a crew can possibly visit, so the system’s job is to order them: severity, consequence if the asset fails, and whether the site can be reached in this season. The crew still climbs the tower, and still files the report in their own words.

DeliverableWhat it containsWhat it leaves out
Defect candidate listLocation on the asset model, class, severity, source imageA repair instruction
Change reportRegistered comparison between epochs, with minimum detectable changeA conclusion about cause
Encroachment mapNew objects inside the right-of-way, with coordinatesA legal determination
Telemetry reviewAnomalies ranked by asset criticality and durationAny control action

Why the error budget comes first

  • A measurement without a stated error cannot be compared with the previous survey
  • Season, vegetation and light differ between flights, and those differences get read as change
  • A false negative on a critical span costs more than a hundred false positives on a minor one
  • The regulator, the insurer and the maintenance planner need the same number to mean the same thing

Telemetry is a different discipline with the same shape. A sensor drifts, a reading sticks, a feeder trips for a reason recorded in a log that nobody joins to the historian. Reviewing it is triage again: rank by consequence, show the evidence, and route the item to somebody with the authority to act on it.

We stay away from control. No set points, no switching, no automation of physical plant. That boundary is not caution for its own sake: control systems carry safety cases and certification regimes a small software engagement cannot satisfy, and pretending otherwise would put our name on something we cannot support at three in the morning.

Documentation is the deliverable that decides whether any of this survives its first year. A runbook, an asset-model description, the threshold history, and a named engineer on the utility side who can restart the service — written for the person who joins after we leave. If that person cannot operate it, the work is unfinished.

A first season is the honest unit of work: one line, one corridor, one inspection cycle, measured against the crew schedule it replaced. Anything larger cannot be judged within a year, and a claim that cannot be judged within a year is marketing rather than evidence.

Questions

Sector questions, without sector claims.

No sector page here names a client. The questions below are about the work itself, which is the part that transfers between organisations.

Can this control equipment?
No. We do not deliver control-system automation for physical plant. The scope is inspection, detection and prioritisation, with operators making the decisions.
Next step

Describe the process, not the sector.

Bring the process as it actually runs: the form, the queue and the person who signs. The sector matters less than that detail.