Forecasting projects usually start with a data question and end with a chart. The useful ones start with an action: order more, staff differently, inspect this week, hold the shipment. Without that action, an improvement in mean absolute error changes nothing anybody cares about.
The second question is what the planner does today. Most organisations already forecast — with a spreadsheet, a rule of thumb, or the memory of last year’s Dashain. That is the baseline, and a model that cannot beat it on the same period is not an improvement, however sophisticated it looks.
| Sector | What is forecast | What the forecast changes |
|---|---|---|
| Retail | Demand per SKU per week | Reorder quantity, markdown timing |
| Energy | Load and outage risk | Crew scheduling, inspection order |
| Banking | Cash demand at a branch | Vault replenishment, staffing |
| Logistics | Transit time on a corridor | Promise dates, buffer stock |
| Agriculture | Harvest window and volume | Collection capacity, transport booking |
Uncertainty is the product
A single number invites a planner to treat it as fact. An interval invites a decision: order the upper bound for a perishable item in peak season, the lower bound when storage is tight. We report intervals and show how often the interval contained the outcome, because an interval nobody has calibrated is decoration.
Peak periods break models trained on quiet ones. Evaluation therefore holds out a known peak — last year’s festival season, the monsoon — and reports performance there separately. A model that is good on average and poor in the two weeks that matter is a model that will be switched off after its first peak.
What the handover includes
- The baseline it was measured against, with the same data and period
- Error by horizon: one week, four weeks, one season
- Calibration of the intervals, and the method used to produce them
- The features that mattered, in plain language
- A retraining schedule, and the signal that should trigger an early one