The request arrives as one sentence in a meeting: we should use AI for this. Whoever says it is senior enough that nobody asks what “this” is, and by the time the budget is written the sentence has become a project. The five questions below decide whether that project produces a working system or a demonstration.
None of the five is about models. Each asks whether your organisation can recognise a correct answer when it sees one, which is the part a purchase order cannot supply.
1. Can you name the decision?
Not the department, not the process — the decision. “Improve customer service” is not a decision. “Decide within four hours whether a complaint needs escalation” is. A decision has an owner, a frequency and a cost when it is wrong; if you cannot name all four, there is nothing to build against.
2. What would a wrong answer cost?
Put numbers on both sides of it. If 8% wrong is unacceptable and 4% is tolerable, write both down and have the person who owns the process sign them. Without that, the project has no definition of done and will end in an argument about whether the pilot worked.
3. Does the system decide, or advise?
Recoverable errors — a mis-sorted ticket, a draft a person edits — can reasonably be automated. Irrecoverable ones, a benefit decision or a clinical instruction, belong to a person, and the system proposes rather than concludes. Decide which side of that line you are on before the design starts, because retrofitting the hand-off costs more than building it.
4. Do you have examples, or only opinions?
A held-out set is data the system has never seen, separated before anyone tuned anything. If the only examples you have are the ones the team has been staring at for months, nothing can be measured honestly. Twenty labelled examples can be enough to begin; zero means the first phase is labelling, not modelling.
5. Who notices a bad answer?
Name the person who sees a bad output, the interval in which they see it, and the report they read it in. Where nobody answers that question, the system fails quietly, and quiet failure is how a tool gets switched off six months later by someone who never trusted it.
The five questions, in short
If you can answer all five on a single page, you have the beginning of a scope. If you cannot, the next step is a two-week framing exercise rather than a pilot — cheap precisely because it is designed to find the reason not to proceed while that is still the cheapest possible outcome.
What the five answers buy you
One page naming the decision, the error budget, the data, the advice-or-decide boundary and the person who notices a bad output is enough to start. It is also enough to stop, which is the more valuable property.
Most failed projects could have been stopped on that page in a week, for the cost of a meeting. They were not, because nobody was asked to write it.
The framing exercise is not a delay
Two weeks of framing feels like a delay when a sponsor wants to see progress. It is the cheapest part of the project and the only part that can prevent the expensive part from being wasted.
Where the exercise concludes that the problem is not ready, that is a result. Write it up, date it, keep it: the same problem usually returns with better data.
The decision to look for
Ask which decision in your organisation is made most often, with the highest cost of error, and the least agreement about the right answer. That intersection is usually where the first project belongs.
Questions this answers
How long should a readiness assessment take?
Do we need to know which model to use first?
- The engineering method
- The five stages a scoped problem goes through.
- Engagement models
- How a framing exercise is scoped and priced.
- Book a scoping call
- Forty-five minutes on one decision.
Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.
Talk through your case