Procurement

What an AI pilot should cost

A pilot buys a measurement and the right to stop. What the budget should cover, what it should produce, and the items a first quote tends to leave out.

24 October 20267 min readKrip Artificial Intelligence Tech

A quotation arrives for twelve weeks of work and a demonstration at the end. The demonstration is the deliverable you can be sure of, and it is not the one you need: a pilot exists to produce a measured result on data the system has not seen, plus a short written note on where it fails. Where both are missing, the budget is buying a performance.

Four line items to insist on

Price varies widely between quotes for what sounds like the same work, and the difference is rarely the model. It is the four items below, which are frequently left out of the first number and appear later as change requests.

What the budget should cover

A quote that covers only the third item is not cheaper; it is incomplete. The first two usually dominate the cost of a pilot in an organisation that has never done this before, and skipping them is how a pilot ends with a number nobody can interpret.

Ask for the pilot to be priced as a fixed scope with a stop condition, rather than as time and materials. Fixing the scope forces the supplier to write down what they believe will happen; the stop condition lets you end the work when the measurement says the idea does not hold, without going back to procurement.

The most useful thing a pilot can deliver is the reason not to continue. If the failure modes are systematic and the data cannot support the decision, learning that at pilot scale costs a fraction of learning it after integration. Say in the contract that a negative result counts as a successful pilot, so nobody is paid to declare victory.

What the money actually buys

A pilot buys a measurement and the right to stop. Framed that way, the budget defends itself: the alternative is discovering the same thing after integration, at ten times the cost, with a team already committed.

The line items that dominate are rarely the model. They are labelling, evaluation design and the hand-over documents — the parts a proposal leaves out because they are not photogenic.

Fixed scope, stated stop condition

Ask for a fixed scope with a named stop condition. It forces the supplier to write down what they believe will happen, and it lets you end the work when the measurement says the idea does not hold, without renegotiating.

Say in the contract that a negative result counts as success. Without that sentence, the incentive is to declare victory and invoice the next phase.

What a board can read

Ask what the pilot will produce that you could show a sceptical board. A demonstration is a performance; a measured note with failure modes is evidence. Only one of the two survives a follow-up question.

Before signing, ask what the pilot will not answer: which questions it leaves open, and what it would cost to answer them. A supplier who can list those has scoped honestly; one who cannot has scoped optimistically.

Questions this answers

Should a pilot reuse our existing data?
Yes, but only if it can be used honestly. Data the team has already studied cannot produce an unbiased measurement unless a clean held-out portion exists.
Is a proof of concept the same as a pilot?
No. A proof of concept shows something is possible; a pilot measures whether it works well enough to use, on data the system has not seen.
Where this connects
How work is priced
What drives cost, and what a proposal states.
The engineering method
What a pilot has to produce to count.
Engagement models
Applied system, research collaboration, review.

Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.

Talk through your case
On this page
Working with KRIP

Engagements start with a written problem definition and an agreed error budget.

Engagement models