The demonstration lasts twenty minutes and the room is impressed. Eighteen months later the model is being run by hand for special cases, and nobody can say when the decision to stop happened. These six causes account for most of that pattern, and five of them are settled in the contract rather than in the code.
1. Success was never defined
Nobody agreed what “working” meant, so the demo decided it. A live demonstration is persuasive because it is unfalsifiable: the presenter chooses the inputs. Fix: an error budget and a held-out test set agreed before work begins.
2. The pilot never left the laptop
The pilot ran on a laptop with a copy of the data. Production needs access, permissions, an environment and somebody on call. Each of those is a project in itself, and none of them appears in a pilot budget. Fix: name the integration point, the owner and the rollback plan in the original scope.
3. The people doing the work were consulted last
The people whose work changes were not in the room when the scope was written. They meet the system at go-live, and their scepticism is earned, because nobody asked them what the current process actually does. Fix: bring the operators who will use the output into the framing stage, not the training session.
4. The output arrives where nobody can act on it
This is the quiet one. A system that is 92% accurate and interrupts a queue twice an hour will be switched off by the people running the queue, and they will be right. Fix: measure what a false positive costs in minutes and disruption, not only the model’s accuracy.
5. No one owns it after hand-over
A model is not a static asset. Inputs drift, suppliers change, staff leave. Without a named owner and a review cadence the system decays until somebody turns it off. Fix: the hand-over document should state who monitors what, and what triggers a retrain or a retirement.
6. The failure has no route to a human
If a wrong answer falls on someone who cannot appeal it, the system will eventually be stopped by the person with the authority to stop it — or worse, it will run and cause harm quietly. Fix: put human review where the cost of an error is highest, and say so before deployment.
Five of the six are decided before any engineering. A one-page problem definition, an agreed error budget and a named review step do more to get a pilot into production than any model choice, and they are the cheapest artefacts in the project.
The pattern behind the six reasons
Five of the six are settled at the framing stage, before any engineering. A one-page problem definition, an agreed error budget and a named review step are therefore worth more than any model choice, and they take a week.
Teams that write them finish their pilots. Teams that start with a model spend the budget on a demonstration and a discussion about whether it worked.
What finishing looks like
A finished pilot produces four things: a measured result on held-out data, a catalogue of failure modes, a hand-over document, and a decision — proceed, stop, or change the problem. The decision is a deliverable, not a meeting that happens later.
The stop decision deserves the same ceremony as the proceed. Organisations that cannot stop do not learn, and the second project inherits the first one's assumptions.
The Monday after go-live
Ask who owns the system on the Monday after go-live. Where the answer is a supplier, you have bought a dependency; where it is a named person inside the organisation, you have bought a system.
Questions this answers
What is the most common cause?
How do we avoid the sixth reason?
- The engineering method
- Where the stalls the post describes are prevented.
- How work is priced
- The line items a first quote tends to omit.
- Trust and responsibility
- What is stated about limits before a pilot.