Procurement

Vendor due diligence for AI

Twelve questions that separate a supplier with a working system from one with a convincing deck, and what each answer changes in the contract.

4 October 20266 min readKrip Artificial Intelligence Tech

The proposal runs to thirty pages, the reference logos fill a slide, and nothing in it says who wrote the system or who is woken when it misreads a document at eleven at night. Diligence here is mostly a set of ordinary questions about ordinary things, asked early enough that the answers can still change the contract.

Twelve questions worth asking

The eleventh is the most revealing. A supplier with a working method answers it calmly, because they have walked away from work before. One who cannot imagine saying no has not yet met a problem that did not fit their product.

The twelfth fixes accountability. If nobody signs the evaluation, the accuracy claim is marketing. A named person who accepts the failure modes before deployment is the cheapest governance mechanism available, and requiring it costs nothing.

What the answers change

Diligence is not a scoring exercise; it edits the contract. Learn on a reference call that the supplier has never handed a system over, and the scope now needs a hand-over clause with named deliverables and an acceptance test. Learn that the accuracy figure came from a public benchmark, and the scope needs a held-out set built from your own data, with the labelling priced.

Ask before the commercial terms are agreed, not after the preferred bidder is chosen. A finding that arrives late can only be absorbed as risk; a finding that arrives early becomes a line item.

Put the reference on the spot

Ask a reference about the failure, not the outcome. "What did not work, and what did you do about it" produces either a specific memory or a silence, and both are informative. A reference who can describe the failure in detail has shipped something real; one who can only praise has usually been briefed. Ask also who they call when the system misbehaves on a Sunday, and whether that person is still on the account.

The question to put to the supplier

Ask them to walk you through one decision the system got wrong in production: what the customer saw, what changed afterwards. A team with an engineering practice answers without flinching, and the answer says more than any case study. A team that cannot recall a single failure has either not shipped, or has not been told.

File the twelve answers with the contract. When a supplier later changes a subprocessor or a model provider, those answers are the baseline you compare against, and comparing is far easier than starting again.

Ask one reference what went wrong, and note whether the answer is specific or a silence. Both are findings.

Questions this answers

What if the vendor is a startup?
Small is not disqualifying — vagueness is. Ask who wrote the system and whether you can speak to that person, not to sales.
Do we need to see the source code?
Not usually. You do need the operating procedure, the limits note and a stated exit path for every component.
Where this connects
Engagement models
What a scoped engagement commits to.
Company registration
The record due diligence starts from.
Trust and responsibility
Limits and disclosure, in writing.

Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.

Talk through your case
On this page
Working with KRIP

Engagements start with a written problem definition and an agreed error budget.

Engagement models