Forty pages go out and six proposals come back, each answering a different question in a different vocabulary, and the panel ends up comparing slide design. A tender written like a software tender produces that, because it asks for capabilities instead of artefacts.
Section 1 — The problem definition
Ask for a one-page statement of the decision being supported, who owns it, how often it is made and what a wrong answer costs — written in the bidder’s own words. A bidder who cannot produce that page in a week has not understood the problem, and model experience does not compensate.
Section 2 — How success will be measured
Require the test methodology, not a claimed score. “94% accuracy” means nothing without the set it was measured on, how that set was kept separate, and which cases failed. Ask how they would build the evaluation set for your case, and who signs the result.
Section 3 — What you keep
Ask what arrives at hand-over: documentation, a limits note, an operating procedure and a rollback plan. A proposal that ends at “deployment” has stopped before the part you will spend the next three years living with.
Section 4 — Data handling
Ask where data is processed, who can read it, what the deletion timeline is, and which subprocessors are involved. The answers should be precise enough to paste into a contract without editing.
Section 5 — Failure modes
List the failure modes the bidder expects, and the ones they consider out of scope. A proposal with none named is either inexperienced or managing the message, and both are expensive after award.
Three questions that disqualify a vendor
Keep the document short. Six pages of specific questions produce better proposals than forty that invite a restatement of marketing claims, and the evaluation takes an afternoon rather than a month.
Ask for artefacts, not capabilities
A capability list produces proposals that cannot be compared. An artefact — a one-page problem definition, an evaluation plan, a hand-over list — produces answers you can score, and it exposes the bidders who have not done the work.
Keep the document short. Six pages of specific questions beat forty that invite restatement of marketing claims, and the evaluation takes an afternoon instead of a month.
Score in the right order
Score the problem definition and the measurement method before price. A cheap bid that has not understood the decision is not cheap; it is a change request waiting for a signature.
Require the name of the person accountable for the delivered system in the bid itself, not in the contract negotiation. Names change behaviour in proposals.
Failure modes in the bid
Ask each bidder to state the failure modes they expect in your case. A bid with none is either inexperienced or managing the message, and both are expensive after award.
Questions this answers
Should we require a pilot in the RFP?
How many vendors should we shortlist?
- AI for government
- Public-sector procurement, in context.
- Engagement models
- What a supplier can be held to.
- Company registration
- The entity details an RFP asks for.
Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.
Talk through your case