Six months from now, somebody will argue about whether the system works well enough. Whether that argument has an answer depends on a document written before anyone had an interest in the outcome.
The nine sections
- The decision supported, its owner, how often it is made and what a wrong answer costs
- The error rate you would call unusable, agreed as a number both sides accept
- The data available, its owner, and what may be shared
- The evaluation method, including how the held-out set is separated
- What the system may decide and what it may only advise
- The review step: who reviews, with what authority
- The deliverables at hand-over: documents, limits note, operating procedure
- The exit terms: export format, deletion timeline, dependencies named
- The people: who signs the evaluation, who is on call after go-live
What makes it enforceable
Numbers and names. "Improve accuracy" cannot be enforced; "at least 92 percent on a three-hundred-case held-out set, signed by the head of operations" can. The same applies to review: "with human oversight" is decoration, "reviewed by the claims assessor before any payment instruction" is a design.
The section everyone skips
Exit terms. Every component that cannot be exported is a component that has to be rebuilt, and every dependency that is not written down is discovered at renewal. One paragraph at the start avoids a negotiation at the worst possible moment.
Who writes which part
The buyer writes the decision and the error budget, because those are the parts the buyer owns. The supplier writes the method and the evaluation design, because that is the part they are being paid for. A scope drafted entirely by one side will be enforceable by that side only, which is how change requests begin.
The clauses that decide the argument later
Every dispute about an AI project is a dispute about a sentence nobody wrote. The error budget is the usual gap: without a number, "it works well enough" is a matter of opinion, and opinions favour whoever is paying.
The review step comes second. "With human oversight" is a phrase; "the claims assessor reviews every output before any payment instruction" is a design. Write the role, the authority and the moment.
Write the exit before the entry
Exit terms take twenty minutes at the start and cost a quarter at renewal. Name the export format, the deletion timeline and every dependency that cannot be moved. A component you cannot export is a component you will rebuild.
The same paragraph protects both sides: a supplier who knows the exit terms can price the work honestly instead of adding a premium for ambiguity.
The signature
Establish who signs the evaluation and whether that person can reject the system. If the signature belongs to someone who cannot say no, the document describes a formality rather than a control.
Draft the exit paragraph first, while nobody is invested in the outcome, and keep it to a page: export format, deletion timeline, dependencies that cannot move. It is the cheapest clause you will ever write.
Write the exit paragraph, the error budget and the review step — in that order, and before the scope itself, because each one constrains the other two.
Questions this answers
Who should draft the scope?
How long should it be?
- The engineering method
- The artefact each stage produces.
- Engagement models
- How scope becomes a proposal.
- Book a scoping call
- The conversation a scope starts with.
Written by the team at Krip Artificial Intelligence Tech. If something here is wrong, write to info@kripaitech.com.np and it will be corrected with the date noted.